Wacker Neuson GPi 1700 Operator's Manual Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 54
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
GPi 1700 Operation
wc_tx001234gb.fm 29
2.14 Using AC Power
Prerequisites
Verify that the engine is operating.
Verify that pilot indicator light (p) is illuminated.
Turn off the equipment to be connected to the generator.
Confirm that the equipment to be connected to the generator does not exceed
the maximum rated power output and specifed amperage.
Engine switch
position
Leave the engine switch (y) in the RUN position while the machine is operating.
Connecting
equipment
1. Insert the equipment plug into the 120V AC GFI receptacle (u).
2. Turn on the power switch for the equipment.
Disconnecting
equipment
3. Turn off the power switch for the equipment.
4. Remove the plug from the 120V AC GFI receptacle.
WARNING
Electric shock hazard. Failure to properly ground the generator could lead to
electrical sparks, especially if the connected electrical equipment is grounded.
f Make sure the generator is properly grounded. See Grounding the Generator.
wc_gr006657
p
y
u
u
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 53 54

Comments to this Manuals

No comments